Tesla Officially Applies For More Land To Expand The Giga Berlin Plant
Tesla Model Y production at the site now runs two shifts.
According to the latest reports from Germany, Tesla proceeds forward to secure more land for the potential expansion of the Giga Berlin-Brandenburg plant in Grünheide near Berlin.
In early May it was reported (unofficially) that Tesla is interested in an additional plot (100 hectare) adjacent to the already massive 300-hectare property.
Yesterday, RBB24 revealed that Grünheide's Mayor Arne Christiani confirmed that Tesla has officially filed the application to acquire the land and expand its site.
It does not automatically mean that Tesla will purchase the plot, but it's expected that now the local government will review the plans and decide. We guess that there is a high probability that Tesla will receive a green light for the expansion.
Tesla Model Y production ramps-up
Meanwhile, the production of the Made-in-Germany (MIG) Tesla Model Y has gradually increased since the production officially started on March 22.
Initially, the Model Y in Germany was produced in a single shift, using 2170-type cylindrical battery cells imported from China (LG Energy Solution). Drive Tesla reports that, according to an unofficial source, on May 23 Tesla added the second shift.
We don't know how many cars are produced per day, but hopefully, it's already in the five-digit range per month, as Europe suffers from constrained EV supply (especially after the temporarily halted production in China).


Tesla Gigafactory 4 (aka Tesla Giga Berlin) at brief:
- located in the Berlin-area (in Grünheide, Brandenburg, Germany), near the new airport
300-hectare property - preparations started in mid-February 2020, while construction works started in late May 2020
- target: production of Model 3/Y starting in 2021 with the Model Y (missed)
- officially launched in March 2022
- expected to to produce batteries (modules/packs and later also 4680-type battery cells) and powertrains
- expected volume of 500,000 annually (unofficial target), initially 150,000 or so
- expected investment of €4 billion (unofficial)
- expected 10,000 jobs (unofficial)
- New tech: 4680-type battery cells, structural battery packs, mega castings (front and rear part of the car) and innovative paint process (Geico Taikisha), but initially will start with 2170-type battery cells
Sources: rbb24.de via driveteslacanada.ca, Drive Tesla
RECOMMENDED FOR YOU
Rivian R2 Range Tested Until It Died: Here's How Far It Went At 70 MPH
Tesla Burned Through Its California EV Rebate Funds In Just Five Days
Something Doesn’t Add Up About The Rivian R2’s EPA Efficiency Rating
The Ford Fathom Will Get a $25,000 Hybrid Crossover Sibling: Report
Tesla Has To Fix Its Super-Bright Headlights. A New Law Could Change Things For Good.
Ford’s New AI Assistant Can Read Your Car’s Manual And Diagnostics
After 87,000 Miles, This 2022 Tesla Model Y Didn’t Just Lose Range. It Charges Slower Too