Home

Tesla

News

Musk: Tesla May Stop Taking Orders For Models With Long Lead Times

CEO says that's because the current lead time for ordering a new Tesla is ridiculously long, in some cases more than a year.

Tesla Giga Texas: General Assembly (Tesla Q4 2021 report)

Dan Mihalascu Dan Mihalascu

By: Dan Mihalascu

May 11, 2022 at 7:56am ET

Add InsideEVs as a preferred source in Google

Share

Comment

Tesla CEO Elon Musk made several interesting comments during the Future of the Car conference hosted by Financial Times, including one about how the company is struggling to meet booming demand for its EVs.

Asked by the moderator whether his actions with Twitter could potentially lead to a commercial impact on Tesla, Musk replied he's confident the company will be able to sell all the cars it can make.

"Currently the lead time for ordering a Tesla is ridiculously long, so our issue is not demand, it is production. Even before those supply chain issues, Tesla demand exceeded production. Now, demand is exceeding production to a ridiculous degree."

While that may sound like a nice problem to have, it is a serious one. Elon Musk admitted that the company is considering stopping taking orders for some of its vehicles for which the lead times are too long.

"We're actually probably going to limit or just stop taking orders for anything beyond a certain period of time because some of the timing is more than a year away."

Gallery: Tesla Giga Texas (Tesla Gigafactory 5)

Tesla Gigafactory Texas (Gigafactory 5) - October 2020

37

Tesla Gigafactory Texas (Gigafactory 5) (Tesla Q4 2020 report) Tesla Giga Texas (Gigafactory 5) - Model Y Factory Construction (Tesla Q1 2021 report) Tesla Giga Texas (Gigafactory 5) - Model Y Factory Construction (Tesla Q1 2021 report) Tesla Giga Texas (Gigafactory 5) - Model Y Factory Interior (Tesla Q1 2021 report) Tesla Giga Texas (Gigafactory 5) - Model Y Factory Interior (Tesla Q1 2021 report) Tesla Giga Texas (Gigafactory 5) - Stamping press (Tesla Q2 2021 report)

He added that Tesla customers are frustrated about the long delivery estimates and many of them are not willing to buy a car for which they have to wait an unreasonable amount of time. This is why Musk says he's not concerned at all with demand generation and thinks a lot about production, engineering and supply chain instead.

As Tesla has been seeing a massive increase in its order rate in several regions of the US, some models are sold out until 2023 in the country, despite significant price increases across the lineup over the last two years.

Currently, several of Tesla's vehicles have delivery estimates into 2023, including the Model Y Long Range (November 2022 to February 2023), Model X Long Range (January to April 2023), and Model S Long Range (October 2022 to January 2023).

What do you think?

View

Comments

The shortest delivery times in the US are for the Tesla Model 3 Performance (June to August 2022), Model 3 Long Range (July to October 2022) and Model 3 RWD (August to November 2022).

You can watch the full interview with Elon Musk in the video above.

Read more about Tesla's delivery estimates

US: Base Tesla Model Y Version Ordered Now Will Arrive In 2023

Here's How Much Tesla Cars Cost And How Long You Will Wait For Delivery

Source: FT Live (YouTube)

We want your opinion!

What would you like to see on Insideevs.com?

Take our 3 minute survey.

- The InsideEVs team

Share this Story

GO TO COMMENTS

(

)

Got a tip for us? Email: tips@insideevs.com

View all comments ( )

Trending

I Drove Volvo’s Long-Range Plug-In Hybrid XC60. It’s A Great Stepping Stone To An EV.

I Drove Volvo’s Long-Range Plug-In Hybrid XC60. It’s A Great Stepping Stone To An EV.

I've Driven Dozens Of Chinese Cars. Americans Are Missing Out On These 4 Features

I've Driven Dozens Of Chinese Cars. Americans Are Missing Out On These 4 Features

I’m Thankful For My Electric Car

I’m Thankful For My Electric Car

$30,000 Ford Fathom: Inside The Structural LFP Battery That Makes It All Possible

$30,000 Ford Fathom: Inside The Structural LFP Battery That Makes It All Possible

Latest Stories

RECOMMENDED FOR YOU



A Used Cybertruck Is Selling A Month Faster Than A Ford F-150



$30,000 Ford Fathom: Inside The Structural LFP Battery That Makes It All Possible



Winter Weather Hits EV Range Hard. One Automaker Handles It Better Than Tesla



I've Driven Dozens Of Chinese Cars. Americans Are Missing Out On These 4 Features



Tesla's EVs Could Get One Big Upgrade Next Year



EVs Outsold Gas And Diesel Cars Combined In The EU In October



Tesla FSD V15 Makes Your Drive Look Like Grand Theft Auto