Home
News
Charging
Most EV Fast Chargers Are Built In Months. Ionna Just Built One In 5 Days
The up-and-coming EV charging operator wants to expand fast, so it’s breaking the mould.

Photo by: 3V3i
Iulian Dnistran 
By: Iulian Dnistran
Mar 23, at 5:58am ET
Add InsideEVs as a preferred source in Google
- (https://twitter.com/intent/tweet?url=https%3A%2F%2Finsideevs.com%2Fnews%2F790783%2Fionna-dc-fast-charger-5-days-build%2F&text=Most%20EV%20Fast%20Chargers%20Are%20Built%20In%20Months.%20Ionna%20Just%20Built%20One%20In%205%20Days&via=InsideEVs)
- copy
Share
Comment
- Ionna, the EV fast charging network backed by several automakers, is expanding fast.
- A big part of the expansion comes down to lightning-fast building techniques.
- In Oklahoma City, Ionna’s partner built a brand new station in less than a week.
Ionna recently celebrated its second anniversary, as well as its 100th EV charging station in the United States. The company, which is backed by several automakers and uses 400-kilowatt DC fast chargers exclusively for its stations, is expanding fast, and now we know why.
Most conventional DC fast charging stations usually need weeks or even months of construction, which can hold back a company’s expansion plans quite a bit. Ionna, however, found a company that dramatically slashed that time to less than a week.
![]()
At an upcoming site in Oklahoma City’s Bricktown district, EV infrastructure developer 3V3i finished construction of a new Ionna fast charging station in just five business days, and there’s a video to prove it. That’s half the time compared to 3V3i’s previous record, and a new benchmark for the industry.
The construction company said that it used a combination of prefabricated charging infrastructure components, integrated engineering and construction design, and a streamlined installation process to get the job done.
"Speed of deployment is one of the biggest challenges facing EV infrastructure expansion," said a 3V3i spokesperson. "Our prefab manufacturing model allows charging networks to dramatically reduce construction timelines, lower project costs, and bring charging capacity online faster."
What do you think?
View
Comments
All this being said, it’s worth noting that these five days were not enough to actually flick the “On” switch at the new charging station. Looking at 3V3i’s own video, it’s clear that the station is pretty much ready to go, with three individual Alpitronic HYC400 stalls on the ground, offering four CCS connectors and two NACS cables. These dispensers have the power electronics built in, so there’s no need for a separate power cabinet. However, the station itself is not yet listed on Ionna’s website, and on PlugShare, the location is listed as “Coming Soon.”
Ionna’s Oklahoma City station is bound to go online sooner rather than later, though, as the company has ambitious expansion plans. It has energized nearly 1,000 bays since opening the first DC fast chargers in December 2024, with 212 charging bays going online this year alone. Going forward, Ionna wants to have no fewer than 30,000 bays operational by 2030–1,000 have already been built, 4,700 are contracted, and nearly 1,500 are under construction.
Gallery: Ionna DC Fast Charging Station In Oklahoma City

4

Source: 3V3i
Stay informed with our newsletter every weekday
back
Subscribe For more info, read our Privacy Policy & Terms of Use.
More Stuff Like This
Ionna Just Hit A Big Milestone, And It’s Offering Serious Discounts
Ionna’s Fast Chargers Don’t Have An App. Here's Why
I Charged The 2026 BMW iX At This Ionna Rechargery. It Was My Best Pit Stop Ever
Rivians Will Get Seamless Plug-And-Charge At Ionna Stations
We want your opinion!
What would you like to see on Insideevs.com?
Take our 3 minute survey.
- The InsideEVs team
Share this Story
- (https://twitter.com/intent/tweet?url=https%3A%2F%2Finsideevs.com%2Fnews%2F790783%2Fionna-dc-fast-charger-5-days-build%2F&text=Most%20EV%20Fast%20Chargers%20Are%20Built%20In%20Months.%20Ionna%20Just%20Built%20One%20In%205%20Days&via=InsideEVs)
- copy
GO TO COMMENTS
(
)
Got a tip for us? Email: tips@insideevs.com
View all comments ( )
Trending

Kia EV3 Lease Deals Are Here, And It’s Cheaper Than The Chevy Bolt And Nissan Leaf

I Let Android Auto Plan My EV Roadtrip. Here’s How It Worked

This Chevy Bolt Has 470,000 Miles. Here’s How Much A New Battery Was

Here's What It's Like To Take Delivery Of A Rivian R2
latest articles
- Waymo Plans To Have 20,000 Cars By The End Of 2027 Oct 20 - News -
- The Boring Company Uses Tesla Model 3 Sleds To Shuttle Shipping Containers Through Its Tunnels Oct 20 - News -
- How Much Range Do EVs Lose When Parked? (And How to Stop It) Oct 20 - EV 101 -
- This Chinese EV Is Now Made In Europe. More Are Coming Oct 20 - News -
- GM Is Closing Its Detroit EV Battery Plant Oct 20 - Industry -
- The 2027 Lexus NX Plug-In Hybrid Gets A Bigger Battery And Fast Charging Oct 20 - Official -
- Kia EV3 Lease Deals Are Here, And It’s Cheaper Than The Chevy Bolt And Nissan Leaf Oct 20 - Pricing -
RECOMMENDED FOR YOU

I Let Android Auto Plan My EV Roadtrip. Here’s How It Worked

This Chinese EV Is Now Made In Europe. More Are Coming

America Now Has More Than 80,000 Public Fast Charging Ports

GM Is Closing Its Detroit EV Battery Plant

America’s Biggest Non-Tesla EV Fast Charging Network Just Hit A New Milestone

The 2027 Lexus NX Plug-In Hybrid Gets A Bigger Battery And Fast Charging

I Tested New York City’s First Lamppost EV Charger. It’s A Game Changer