Porsche received a permit this Summer for remodeling the existing parking deck at its headquarters in Atlanta, GA to handle six electric vehicle charging stations. The construction will cost $96,800.

Porsche Mission E Concept

Porsche Mission E Concept

It's expected that these units will be the company's new 350 kW fast charging stations, that were also installed in Berlin in July. The U.S. version will be of course equipped with different plug - the CCS Combo 1 instead of Combo 2.

It's not clear at this stage, whether all six stalls will be 350 kW DC or not; as in Berlin for example there are two DC stands and two Level 2 AC.

The 350 kW charging at 800 V is one of the main features of the upcoming all-electric Porsche Mission E, which was promised to charge up to 80% in 15 minutes.

Porsche DC Infrastructure (source: Buildzoom)

Porsche DC Infrastructure (source: Buildzoom)

source: Buildzoom via Electrek